11 case studies

TRACK RECORD

E,I&C project schedule, 2019–2026.

Client / EPCCountryContractScope of workYearStatus
PESCOUAE264 MW power plantInstallation, pre-commissioning, commissioning & start-up of 2 GE units and all BoP, incl. performance test2019Completed
SEPOCYemenFrame 5C & 5D overhaulGas-turbine overhauls and control upgrade Mark IV → Mark VIe2019Completed
OMVYemenCPF installation & commissioningSync, PMS & load management for 4 × RR gas engines, 5.8 MW each2020Completed
BajelYemenGas-engine control migrationModicon (Schneider) to Allen-Bradley control system2020Completed
YICOMYemenTank monitoring systemEPC of tank-gauging system on Endress+Hauser2020Completed
OMVYemenCPF fire systemEPC of MCC fire detection and FM-200 suppression2021Completed
GriffinYemenTrunkline control systemEPC of pipeline trunkline control between EPFs and CPF2022Completed
SEPOCYemenCPU ↔ CPU II interconnectionSICAM PMS integrating 3 Solar GTs and 3 RR AVON GTs across two plants2022Completed
SEPOCYemenGT control-panel upgradeFT100 → FT125 installation, commissioning & start-up2023Completed
IngenuityYemenFEED: 75 MW GT plantElectrical & automation FEED, Block 10 PetroMasila upgrade2023Completed
SEPOCYemenBarton chart digitalisation120 chart recorders converted to PLC self-calculation2024Completed
SEPOCYemenDCS upgrade Foxboro → PlantPAxTop & second-layer migration, gas plant and compressors2024Ongoing
Masdar / EMCYemen120 MWp Aden solar plantMV/LV construction: 36 kV & 3.3 kV terminations, substations T&C2024Completed
UTICO / Yellow DoorUAESolar + BESS SCADA EPCTurnkey SCADA: trackers, weather stations, gensets, synchronisation2024–26Ongoing
Aden PortsYemenRTG crane migrationRTG drive-system and control migration2024Completed
ADNOC / TecnimontUAETCF power plant SCADA & PMSTurnkey Emerson PLC/SCADA and power management2024–25Completed
ADNOC / TecnimontUAECamp power plant SCADA & PMSTurnkey Emerson PLC/SCADA and power management2024–25Completed
ATGC / GSUYemen40 MW hybrid solar: SCADATurnkey Siemens PLC/SCADA and PMS2025–26Ongoing
ATGC / GSUYemen40 MW solar: CCTVComplete plant CCTV solution2025–26Ongoing
ATGC / GSUYemen40 MW solar: electricalSite installation & pre-commissioning: MV, LV, control2025–26Ongoing

POWER MANAGEMENT

Synchronisation and PMS record, 2011–2026.

Fifteen years of synchronisation and load-sharing delivery by our team, from twin-genset island plants to multi-technology interconnections and PV + BESS + genset hybrids.

Plant / clientSystem scopeControl platformYear
DNO Block 43 CPFSync & power sharing: 2 × CAT 1.5 MW + 2 × Waukesha 1 MW gaseasYgen 32002011
Aden AirportSync & PMS: 1 × MHI 1.5 MW + 2 × Cummins 400 kWeasYgen 32002012
Water Authority: Ahmed WellSync & PMS: 1 × MHI 1.5 MW + 4 × Perkins 1.5 MWeasYgen 32002012
Water Authority: Naser WellSync & PMS: 1 × MHI 1.5 MW + 2 × Perkins 1.5 MWeasYgen 32002013
Water Authority: AdenSync & power sharing: 1 × CAT 1.5 MW + 2 × Perkins 1.5 MWDeepSea2017
OMV Block S1Sync & power sharing: 1 × GE JGC 1.5 MW gas + 2 × CAT 500 kWDeepSea2019
SEPOC Block 18 CPUPower sharing: 3 × Solar C-50 gas turbines, 4 MW eachAllen-Bradley CGCM2019
SEPOC Block 18PMS + load management: 3 × RR AVON 16 MW + 3 × Solar 4 MWSICAM 8000 + ControlLogix2021
OMV Block S1 CPFSync, PMS & LMS: 4 × RR gas engines, 5.8 MW eachDEIF AGC-3 + S7-4002022
OMV Block S1 EPF1Sync & PMS to grid: 3 × CAT 1.5 MWDEIF AGC-1502022
OMV Block S1 EPF2Sync & PMS to grid: 2 × Cummins 1.2 MWDEIF AGC-1502022
OMV Block S1 EPF3Sync & PMS to grid: 3 × CAT 1.5 MWDEIF AGC-1502022
SEPOC: Alraja gas plantPMS: 3 × CAT gas 1.2 MW + Solar C-20 gas turbineDEIF AGC-150 + ControlLogixOngoing
Dome Advanced, UAEOn-grid PMS: 2.2 MWp PV + 1.5 MW BESS + 3 × 800 kVA gensetsDEIF AGC-150 + ControlLogixOngoing

START A CONVERSATION

Tell us about your plant. We will tell you how we would deliver it.

Send an RFQ, a single-line diagram or just a description of the problem. An engineer replies, not a call centre.

Hi, I am DAC Assist. Ask me about our systems, projects or offices.